General Tab (BACnet Schedule View)

The General Tab of the Schedule Control (from a BACnet Schedule View configuration) Runtime (Calendar View) properties lets you set initial schedule information. You can edit information in the following tab sections:

 

General Tab in the Schedule Control (from a BACnet Schedule View configuration) in GraphWorX64 Display Runtime

Priority Level

Application

 

Priority Level

Application

1

Manual Life Safety

 

9

Available

2

Automatic Life Safety

 

10

Available

3

Available

 

11

Available

4

Available

 

12

Available

5

Critical Equipment Control

 

13

Available

6

Minimum On/Off

 

14

Available

7

Available

 

15

Available

8

Manual Operator

 

16

Available

Select Schedule Data Type Dialog


 

Effective Period

See Also:

Schedule Control Runtime (BACnet Schedule View)

Weekly Tab (BACnet Schedule View)

Exceptions Tab (BACnet Schedule View)

Point List Tab (BACnet Schedule View)